Crews are still clearing out the old and making room for the new.  This project has been actively progressing for 4 months and although progress is typical of a building re-fit, the facts must be stated in order to get a feeling of its magnitude.

The images below represent additional work to prepare sections of the warehouse floor (top left and right) and cutting steel (bottom left) not needed in the rear of the warehouse.

So far, we have removed, and sent to recycling, over 275 tons of concrete and block. By the end this number is expected to be greater then 325 tons. The additional steel being removed increases our total metal recycle to 100 tons of steel, copper and aluminum.



Thursday, April 5, 2012

"How many evergreens are there between our house and your school?"  "Count them as you walk."  My father required that I take this count while I walked to Rock Creek Valley Elementary School in the fourth grade.  He was trying to make me become more observant of those things around me. 

I hated the assignment.  But as the years ticked by I began to understand the value of knowing my surroundings, and more importantly the potential of opportunities not yet realized or not yet visibily evident.  While walking through the building I realized all the natural light streaming through the roof.  These will become sky lights. I recognized the interior wall that was carefully dismantled to get rid of the old and save the wall with built-in windows. These two features alone will add a unique personality to our building. And contribute to making this a LEED certified building.  In addition, many other personal touches will be added to convert this old building into a vibrant 7 1/2 acre corporate campus complete with state of the art offices, a 9000 square foot showroom with conference rooms and training center, and even an outside picnic area with walking trails.

Wednesday, March 14, 2012

As a kid I would build plastic model ships from kits.  I remember the first dozen steps would be sub-assemblies of critical components needed later. Once these sub-assemblies were completed and combined together, I was able to see what the final product would look like. 


Over the past few months the progress with the demolition and clearing out of the debris has been enormous. The completion of the preliminary stages has opened a new and expanded appreciation for what the final building will look like.

When I walked thru the buiding today I could clearly envision its size, scope and potential.  The first image shows parts of the warehouse and measures 150 paces end to end. The second image is the interior solarium that will add definition and character to the main office and showroom.

Tuesday, March 6, 2012

"I was at the building today. The demolition has been going very well with few surprises, except for some positive ones. Offices are completely gutted and the warehouse should be completed by the end of the week."  Ron Hux



Monday, February 20, 2012

VISION.  Most people see an old out-dated building, others see potential, few see opportunity. Fewer are willing to make the hard decisions.

Demolition work continues on the inside and out. Metal and stone are seperated into piles for recycling. Check back for updates on interior plans including concepts. 


Wednesday, February 8, 2012

       
The beginning stages have begun. First comes the demolition, but not without prior arrangements to re-use selected material such as doors and door frames, certain fixtures and equipment.  Dumpsters filled with debris and building material are hauled to a nearby facility for recycling.

Wednesday, January 4, 2012

The hard work begins soon.  This building will be transformed to encompass 21st century technologies, reflect the finest in design and space planning, appeal to our diverse client base and serve as the new home for Douron, Incorporated.