Tuesday, December 4, 2012

Building Progression

 
Significant advances have been made in the past five weeks.  The addition that will house part of our design and sales team now has a roof.  The floor is currently being prepared with sufficient subflooring and the installation in floor level electrical and data conduit, thereby avoiding having to use floor to ceiling power poles. 

  What is not seen is that we have begun using parts of the 60,000 square foot warehouse to manage the distribution of large projects and to begin storing product that will eventually become part of our showroom and offices. 

These are exciting times.  Multiple trades are working simultaneously. One such example is that the window and glass company has carefully measured each window and installed energy efficient glass in all window openings - which will serve as another contributing factor in our planned LEED certification.




Friday, October 19, 2012

Constuction  continues with progress on our 4000 square foot addition and the front entrance.  The footers were poured and walls were erected.  Earlier this week the trusses were placed and the front entrance was beginning to take shape.
 
The more this project comes together, the easier it is to imagine what the exterior will look like.
Meanwhile, the warehouse which was completed months ago is now being used to warehouse product that will be used in our offices and showroom.





Tuesday, September 11, 2012




This week we started phase two of our new corporate campus.   During this stage we are removing two exterior walls in order to open up the area for a 4,000 square foot office addition. We will also replace all exterior windows and construct a new entrance where the old outdated front door used to be.















Wednesday, July 25, 2012

When I was compiling these images I was impressed by the complete transformation I've witnessed over the past 6 months, causing me to reflect on the value of adapting.  Business, like people, need to adapt to the current and projected environment in order to excel.  Darwin wrote books about this, explaining the value of certain species adapting to their environment in order to continue to survive. Business journals frequently discuss change and how to adapt to the evolving marketplace.

This is Douron's story - and why we can do things better and smarter, while providing ever expanding and greater value to our clients.

6 months ago, work began at 10 Painters Mill Road to transform an old and outdated building into a world class corporate campus and distribution facility.  Images below show the progression of the warehouse component from the early stages. Last week the main warehouse which measures 400' long x 100' wide  received its much anticipated floor re-finishing which reflects our commitment to "best practices" and to providing our employees with the best work environment.

Image # 1: warehouse preperation (March 14, 2012 )
Image # 2: after some concrete replaced (April 1, 2012)

Image # 3: after floor treatment (July, 23, 2012)

Friday, July 13, 2012


With the demolition of the interior office and warehouse space now complete we are moving forward with the reconstruction process. We will be starting the addition mid to late August and do anticipate moving in most likely early spring. As most of you know I worked very hard to recycle the materials that came out of the building. Not only does this make good business sense, it makes a significant impact on our local resources. I wanted to share with you the amount of material that has come out of the building and how much has been recycled. Attached are the final statistics of this phase of our reconstruction. These numbers absolutely amaze me. I hope you are as impressed as I am. 
  • Total Recycle:  1,265.86 tons - that's over 2 1/2 million pound, including:
    • 233,780 lbs. of steel
    • 6,069 lbs. of aluminum
    • 4,464 lbs. of stainless steel
    • 2,351 lbs. of copper
  • Total of 91% construction waste diversion.
Ron Hux

Thursday, June 14, 2012

Weeks ago Buck Showalter (manager of the Baltimore Orioles baseball team) commented on center fielder Adam Jones 6 year contract saying "I'm a believer in putting something together that stands the test of time." Recent stat's of the teams performance shows that this approach has been productive.

Our planned corporate campus is in the midst of being put together and today there are 2 processes occuring simultaneously: (a) we've partnered with an A & D firm for the design of the building addition and (b) work is continuing on the inside. 

The images reflect the best and brightest of what's been happening inside.  Since painting the walls and ceiling of the warehouse, the area has become much brighter. When shooting the image of the main warehouse (left), the camera was set on an ISO sensitivity of 200 (almost an outdoor setting) without using a flash. This brightness will save quite a bit of electricity.

Image number 2 (right) shows the back part of the warehouse. Originally the floor was about 16" lower then the rest of the warehouse and in order to have all floors level, this section was built up using base filler and 110 cubic yards of concrete.

The decision to brighten the warehouse and level the floors represent 2 investments that will indeed be well appreciated by all of our team members.

Thursday, May 17, 2012

Work continues in the warehouses.  With most of the demolition done in the main 40,000 sq ft warehouse, we are now focusing our attention on putting everything back together. Certain areas of the floor in the main warehouse needed to be replaced. We had hoped that we could get away with patching the floors however it was pretty much the same price to take up the existing cement and put down a new floor. We also decided to paint the walls and ceilings white to brighten the area and blend in the various differences created over the years from adding processing rooms. Even though only half of the warehouse has been painted you can clearly see how this has made a visual difference in the overall appearance of the space.

The back warehouse has been quite a challenge. This area had a mezzanine in it which we demolished a few weeks back. This was not a easy task as the walls were 16” thick solid concrete reinforced with #8 rebar both vertically and horizontally. The men who performed the work told me that they have never seen anything like this. We knew the area was built to withstand a explosion but had no idea as to how big of a explosion they were planning on. This was, no surprise, just amazing.   After two weeks of jack hammering and using pretty heavy equipment to break up the walls progress is being seen. This means we have spent 5 weeks just on tearing down the mezzanine. which will hopefully be completed by the end of next week. 

After this we will need to put in a new floor in the back half of the warehouse so it is even with the main warehouse. This will eliminate the ramps and make the space so much easier to use. It will be worth the effort. When done, this space will be 30 ft high and add 15,000 sq ft. clear storage to the 40,000 square foot main section.

Additionally, work will continue with the addition of a sprinkler system and high output energy efficient lighting. Our hope is to have this warehouse ready to be used, if necessary, by mid July.    update courtesy of Ron Hux, 5/16/12