Wednesday, April 17, 2013


Great progress has been made over the past few weeks including framing of offices, insulating critical areas including some interior walls, and drywall/painting of the first of many offices.  Open spaces have been designed, furniture ordered, and plans are moving foward for a june/july occupancy.

We started using the warehouse to serve as our premier distribution center. Meanwhile, multiple trades are working simultaneously including HVAC, landscaping, plumbing, and finishing. On the outside of the building the grounds are being cleaned up and graded; the exterior of the building is being finalized.  Within the next couple weeks, ceilings will be suspended where applicable, fixtures will be installed, and the original solid wood doors, which were saved during the initial de-construction, will be re-hung.

Friday, March 1, 2013


I saw 3 different trades at work this morning, including HVAC, framing and drywall, and electrical.  The image below shows ductwork beginning to be installed in the 30,000 square foot showroom & conferencing center.  Other areas of the building are also having ductwork installed and eventually this will be all tied together into a well planned HVAC system.
 
Framing of some of the private offices has also begun.  At the accelerated pace that has been occuring, these private offices should be wired and drywalled within a short period of time.
 
  Other areas of the building will also show significant advancment over the next few weeks.  In fact, the NW corner of offices is  the location of the first drywall that has been hung. 

Friday, February 15, 2013

message from Ron Hux:

In December we started on the interior build-out of our offices. Since December we’ve made significant progress on the infrastructure including welding new roof trusses where HVAC units will be sitting, installing a new roof on the showroom area to meet LEED requirements and placing sky lights and a new roof structure in a small area in the showroom. I made a decision early on not to use the existing plumbing so all new pipes had to be put in the floors. In addition, we removed a block wall to expand the accounting area and installed the fire sprinkler system.
 
interior views highlighting build-out and the glass enclosures of our 4000 sq. ft. addition
With all this behind us now, the crews are concentrating on framing and building out the space. We expect this to progress rapidly.  By mid-March framing should be complete and drywall should begin to be hung.
 
left to right: the delivery of drywall has begun, new roof trusses, interior view looking northeast
 

Thursday, December 27, 2012

Finishing the year strong

Years ago I used to participate in long distance running races and olympic distance triathlon's.  My training regiments included "track work-outs" with like minded individuals.  I'll always remember the coach would bark out commands offer encouragement as we crossed the finish line on every distance set. " Finish strong. Don't slow down. Run all the way through the finishline."

Well, here we find ourselves at the end of 2012 and we have multiple crews working hard.  One crew works at finishing off the main entrance (left) while another crew works at setting the side entrance (right).  Simultaneously, window and door frames are being added to the addition.

Hard and persistent work does lead to noticeable progress. Commenting on my running days: after each set, we'd get 15 seconds rest and do it all over again.  It amounted to quite a workout during that 1 hour and in the end we all turned out better, stronger and faster.  Not surprisingly, one of the participants was a part of the 2000 summer Olympics team.

Beginning in the new year, these crews will continue to work hard on this 2nd phase of our project.  Follow our progress regularly as we share stories on the transformation of this once aged building into our new corporate campus with state of the art features, a beautiful showroom and designer center, LEED certification, and  more.

Tuesday, December 4, 2012

Building Progression

 
Significant advances have been made in the past five weeks.  The addition that will house part of our design and sales team now has a roof.  The floor is currently being prepared with sufficient subflooring and the installation in floor level electrical and data conduit, thereby avoiding having to use floor to ceiling power poles. 

  What is not seen is that we have begun using parts of the 60,000 square foot warehouse to manage the distribution of large projects and to begin storing product that will eventually become part of our showroom and offices. 

These are exciting times.  Multiple trades are working simultaneously. One such example is that the window and glass company has carefully measured each window and installed energy efficient glass in all window openings - which will serve as another contributing factor in our planned LEED certification.




Friday, October 19, 2012

Constuction  continues with progress on our 4000 square foot addition and the front entrance.  The footers were poured and walls were erected.  Earlier this week the trusses were placed and the front entrance was beginning to take shape.
 
The more this project comes together, the easier it is to imagine what the exterior will look like.
Meanwhile, the warehouse which was completed months ago is now being used to warehouse product that will be used in our offices and showroom.





Tuesday, September 11, 2012




This week we started phase two of our new corporate campus.   During this stage we are removing two exterior walls in order to open up the area for a 4,000 square foot office addition. We will also replace all exterior windows and construct a new entrance where the old outdated front door used to be.