Crews are still clearing out the old and making room for the new. This project has been actively progressing for 4 months and although progress is typical of a building re-fit, the facts must be stated in order to get a feeling of its magnitude.
The images below represent additional work to prepare sections of the warehouse floor (top left and right) and cutting steel (bottom left) not needed in the rear of the warehouse.
So far, we have removed, and sent to recycling, over 275 tons of concrete and block. By the end this number is expected to be greater then 325 tons. The additional steel being removed increases our total metal recycle to 100 tons of steel, copper and aluminum.