Building Progression

 
Significant advances have been made in the past five weeks.  The addition that will house part of our design and sales team now has a roof.  The floor is currently being prepared with sufficient subflooring and the installation in floor level electrical and data conduit, thereby avoiding having to use floor to ceiling power poles. 

  What is not seen is that we have begun using parts of the 60,000 square foot warehouse to manage the distribution of large projects and to begin storing product that will eventually become part of our showroom and offices. 

These are exciting times.  Multiple trades are working simultaneously. One such example is that the window and glass company has carefully measured each window and installed energy efficient glass in all window openings - which will serve as another contributing factor in our planned LEED certification.